The economic benefits of green buildings: a comprehensive case study R Ries, MM Bilec, NM Gokhan, KLS Needy The engineering economist 51 (3), 259-295, 2006 | 373 | 2006 |
A classification scheme for the process industry to guide the implementation of lean FA Abdulmalek, J Rajgopal, KLS Needy Engineering management journal 18 (2), 15-25, 2006 | 320 | 2006 |
A procedure for smooth implementation of activity-based costing in small companies N Roztocki, JD Porter, RM Thomas, KLS Needy Engineering Management Journal 16 (4), 19-27, 2004 | 233 | 2004 |
Human related issues in manufacturing cell design, implementation, and operation: a review and survey B Bidanda, P Ariyawongrat, KLS Needy, BA Norman, ... Computers & Industrial Engineering 48 (3), 507-523, 2005 | 192 | 2005 |
Worker assignment in cellular manufacturing considering technical and human skills BA Norman, W Tharmmaphornphilas, KL Needy, B Bidanda, RC Warner International Journal of Production Research 40 (6), 1479-1492, 2002 | 189 | 2002 |
Integrating activity-based costing and economic value added in manufacturing N Roztocki, KLS Needy Engineering Management Journal 11 (2), 17-22, 1999 | 125 | 1999 |
Development of a simultaneous design for supply chain process for the optimization of the product design and supply chain configuration problem NM Gokhan, KLS Needy, BA Norman Engineering Management Journal 22 (4), 20-30, 2010 | 100 | 2010 |
Methods for handling uncertainty in activity based costing systems H Nachtmann, KLS Needy The Engineering Economist 48 (3), 259-282, 2003 | 90 | 2003 |
Implementing activity-based costing systems in small manufacturing firms: A field study KLS Needy, H Nachtmann, N Roztocki, RC Warner, B Bidanda Engineering Management Journal 15 (1), 3-10, 2003 | 85 | 2003 |
An examination of the economic benefits of ISO 9000 and the Baldrige Award to manufacturing firms JP Wilson, MAT Walsh, KLS Needy Engineering Management Journal 15 (4), 3-10, 2003 | 84 | 2003 |
Fuzzy activity based costing: a methodology for handling uncertainty in activity based costing systems H Nachtmann, KLS Needy The Engineering Economist 46 (4), 245-273, 2001 | 81 | 2001 |
EVA for small manufacturing companies N Roztocki, KL Needy Proceedings from the 1999 SAM International Management Conference, 461-469, 1999 | 70 | 1999 |
Modeling risk in a design for supply chain problem E Claypool, BA Norman, KLS Needy Computers & Industrial Engineering 78, 44-54, 2014 | 60 | 2014 |
An integrated activity-based costing and economic value added system as an engineering management tool for manufacturers N Roztocki, KL Needy Proceedings from the 1998 ASEM National Conference 77, 84, 1998 | 58 | 1998 |
Supplier quality management inside and outside the construction industry RY AlMaian, KLS Needy, KD Walsh, TCL Alves Engineering Management Journal 27 (1), 11-22, 2015 | 53 | 2015 |
Building design and performance: A comparative longitudinal assessment of a Children's hospital CL Thiel, KLS Needy, R Ries, D Hupp, MM Bilec Building and Environment 78, 130-136, 2014 | 51 | 2014 |
Assessing human capital: a lean manufacturing example KLS Needy, BA Norman, B Bidanda, P Ariyawongrat, ... Engineering Management Journal 14 (3), 35-39, 2002 | 51 | 2002 |
A cost model for the evaluation of alternative cellular manufacturing configurations KLS Needy, RE Billo, RC Warner Computers & industrial engineering 34 (1), 119-134, 1998 | 47 | 1998 |
How to design and implement an integrated activity-based costing and economic value added system N Roztocki, KL Needy Proceedings from the Industrial Engineering research'99 Conference, 1999 | 46 | 1999 |
Fundamentals of engineering economic analysis JA White, KS Grasman, KE Case, KLS Needy, DB Pratt John Wiley & Sons, 2020 | 43 | 2020 |