Seguir
Kim LaScola Needy
Título
Citado por
Citado por
Año
The economic benefits of green buildings: a comprehensive case study
R Ries, MM Bilec, NM Gokhan, KLS Needy
The engineering economist 51 (3), 259-295, 2006
3732006
A classification scheme for the process industry to guide the implementation of lean
FA Abdulmalek, J Rajgopal, KLS Needy
Engineering management journal 18 (2), 15-25, 2006
3202006
A procedure for smooth implementation of activity-based costing in small companies
N Roztocki, JD Porter, RM Thomas, KLS Needy
Engineering Management Journal 16 (4), 19-27, 2004
2332004
Human related issues in manufacturing cell design, implementation, and operation: a review and survey
B Bidanda, P Ariyawongrat, KLS Needy, BA Norman, ...
Computers & Industrial Engineering 48 (3), 507-523, 2005
1922005
Worker assignment in cellular manufacturing considering technical and human skills
BA Norman, W Tharmmaphornphilas, KL Needy, B Bidanda, RC Warner
International Journal of Production Research 40 (6), 1479-1492, 2002
1892002
Integrating activity-based costing and economic value added in manufacturing
N Roztocki, KLS Needy
Engineering Management Journal 11 (2), 17-22, 1999
1251999
Development of a simultaneous design for supply chain process for the optimization of the product design and supply chain configuration problem
NM Gokhan, KLS Needy, BA Norman
Engineering Management Journal 22 (4), 20-30, 2010
1002010
Methods for handling uncertainty in activity based costing systems
H Nachtmann, KLS Needy
The Engineering Economist 48 (3), 259-282, 2003
902003
Implementing activity-based costing systems in small manufacturing firms: A field study
KLS Needy, H Nachtmann, N Roztocki, RC Warner, B Bidanda
Engineering Management Journal 15 (1), 3-10, 2003
852003
An examination of the economic benefits of ISO 9000 and the Baldrige Award to manufacturing firms
JP Wilson, MAT Walsh, KLS Needy
Engineering Management Journal 15 (4), 3-10, 2003
842003
Fuzzy activity based costing: a methodology for handling uncertainty in activity based costing systems
H Nachtmann, KLS Needy
The Engineering Economist 46 (4), 245-273, 2001
812001
EVA for small manufacturing companies
N Roztocki, KL Needy
Proceedings from the 1999 SAM International Management Conference, 461-469, 1999
701999
Modeling risk in a design for supply chain problem
E Claypool, BA Norman, KLS Needy
Computers & Industrial Engineering 78, 44-54, 2014
602014
An integrated activity-based costing and economic value added system as an engineering management tool for manufacturers
N Roztocki, KL Needy
Proceedings from the 1998 ASEM National Conference 77, 84, 1998
581998
Supplier quality management inside and outside the construction industry
RY AlMaian, KLS Needy, KD Walsh, TCL Alves
Engineering Management Journal 27 (1), 11-22, 2015
532015
Building design and performance: A comparative longitudinal assessment of a Children's hospital
CL Thiel, KLS Needy, R Ries, D Hupp, MM Bilec
Building and Environment 78, 130-136, 2014
512014
Assessing human capital: a lean manufacturing example
KLS Needy, BA Norman, B Bidanda, P Ariyawongrat, ...
Engineering Management Journal 14 (3), 35-39, 2002
512002
A cost model for the evaluation of alternative cellular manufacturing configurations
KLS Needy, RE Billo, RC Warner
Computers & industrial engineering 34 (1), 119-134, 1998
471998
How to design and implement an integrated activity-based costing and economic value added system
N Roztocki, KL Needy
Proceedings from the Industrial Engineering research'99 Conference, 1999
461999
Fundamentals of engineering economic analysis
JA White, KS Grasman, KE Case, KLS Needy, DB Pratt
John Wiley & Sons, 2020
432020
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20